Prepping the Bark
Weeks after harvesting the bark, it was time to prepare the stuff for the birchbark canoe build. This involved some pre-soaking before the coiled bark could be safely unrolled on the building bed. I brought down 5 of the largest rolls down to the lake and fastened them together with some nylon cord. I managed to find an old concrete anchor with a rusted chain in the shallows of the lake used this as a tie-down point. Bark is very bouyant of course, so within each roll, I used some stones by the shore to weigh them down and submerge them fully. Dried bark rolls; Soaking in the lake After this overnight soak, the bark was carefully unrolled onto the building bed for the messiest part of the process - cleaning. The outer layers of the bark need to be scraped to remove the accumulated moss, dead bark, and general detritus in order for proper stitching with spruce root. Using a dull, broken knife picked up at a flea market for pennies (which I intend to use for harvesting pine resin later)...